ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

  1. Public
  2. 研究紀要
  3. 次世代基盤技術研究所報告
  4. 4(2013)
  1. Private
  2. 研究紀要
  3. 次世代基盤技術研究所報告Kinki University Research Institute of Fundamental Technology for Next Generation
  4. 4(2013)

〈再録論文〉A Comprehensive Solution in Production Planning using Bayesian Estimation

https://kindai.repo.nii.ac.jp/records/13849
https://kindai.repo.nii.ac.jp/records/13849
6539ac46-fae0-4609-82bd-8f55820ab72d
Item type ☆学術雑誌論文 / Journal Article(1)
公開日 2014-07-23
タイトル
タイトル 〈再録論文〉A Comprehensive Solution in Production Planning using Bayesian Estimation
著者 Kataoka, Takayuki

× Kataoka, Takayuki

Kataoka, Takayuki

ja-Kana カタオカ, タカユキ

Search repository
Hanafuji, Atsushi

× Hanafuji, Atsushi

Hanafuji, Atsushi

ja-Kana ハナフジ, アツシ

Search repository
Kanezashi, Masakazu

× Kanezashi, Masakazu

Kanezashi, Masakazu

ja-Kana カネザシ, マサカズ

Search repository
言語
言語 eng
キーワード
主題 Bayesian Estimation, Production Planning, Urgent Works
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_6501
資源タイプ journal article
アクセス権
アクセス権 metadata only access
アクセス権URI http://purl.org/coar/access_right/c_14cb
著者 所属
値 近畿大学工学部
著者 所属
値 近畿大学工学部
著者 所属
値 近畿大学工学部
著者所属(翻訳)
値 Kinki University
著者所属(翻訳)
値 Kinki University
著者所属(翻訳)
値 Kinki University
著者 役割
値 Corresponding Author
版
出版タイプ VoR
出版タイプResource http://purl.org/coar/version/c_970fb48d4fbd8a85
出版者 名前
出版者 近畿大学次世代基盤技術研究所
書誌情報 近畿大学次世代基盤技術研究所報告
en : Kinki University Research Institute of Fundamental Technology for Next Generation

巻 4, p. 131-137, 発行日 2013-06-01
ISSN
収録物識別子タイプ ISSN
収録物識別子 21858802
抄録
内容記述タイプ Abstract
内容記述 [Abstract]Almost every manufacturing site has been supported by a lot of part-time, temporary, or mid-career personnel given the poor state of the economies all over the world. Expert managers of front-line workers must design more complex production planning strategies that take urgent orders into consideration. Therefore, the purpose of our study is to develop production planning models using the inference method suggested by Mahadevan et al. on the study of architecture field, and to verify our solution in production planning that can take urgent orders into consideration. First, what overflowed work element moves to another process is assumed as "Dummy Moving Element (DME)". Next, DME estimation analysis and improvement using Bayesian estimation are discussed. Finally, the effectiveness of our model is verified by a comprehensive numerical experiment.
内容記述
内容記述タイプ Other
内容記述 [再録元]Proceedings of the Asia Pasific Industrial Engineering & Management Systems Conference 2012V. Kachitvichyanukul, H.T. Luong, and R.Pitakaso Eds.
資源タイプ
内容記述タイプ Other
内容記述 Journal Article
戻る
0
views
See details
Views

Versions

Ver.1 2023-06-20 23:09:01.150960
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3